chat

Start Chat

Smart systems for green and utility roofs

NHL Hogeschool (hydroseeding)

Leeuwarden, 2015

Extensive Green Roof Systems

Realization:

Flora Nova, Ophemert 


Type of utility roof system:

Nophadrain Extensive Green Roof System

Surface:

1,150 m²


ND Products:
ND 4+1lt Drainage System
ND RS-8 Inspection Chamber
ND Hydroseeding

Next
Previous
NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB7.jpg
Next
Previous
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB7.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB10.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB9.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB3.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB4.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB1.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB8.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB5.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB6.jpg
  • NHL Leeuwarden_Nophadrain Extensief Groendaksysteem_2016_WEB2.jpg

NHL is an educational institution for higher education in the Netherlands. The institution has more than 11,000 students and more than 1,000 employees. On the roof of the headquarters in Leeuwarden the installation of a Nophadrain Extensive Green Roof System (by means of hydroseeding) was started in 2015.

The ND 4+1lt Drainage System is the heart of the green roof system. It functions as a filter, drainage, waterbuffering, protection and separation layer. De vegetation consists of sedum. This was installed by means of hydroseeding. Nophadrain offers a total package for hydroseeding: ND Hydroseeding. The pictures shows footage of installation and the situation of 1 year after installation.

About hydroseeding:
Nophadrain offers a complete package that consists of the delivery and application of the complete sedum vegetation by means of hydroseeding. The complete package includes the rental of the machine, the labour, and all necessary materials. More information? Visit our hydroseeding page.

Share this project on